Back Home | Homepage | Favorites
产品销售在线留言
·Current position: Home > BOP thermal recovery wellhead equipment
Product introduction Recommended products Contact us

When injecting steam and heating in heavy oil well production, crude oil reservoir is heated; after steam injection, BOP combination valve and stem injection valve are closed for soaking; after soaking, the BOP combination valve is opened for boosting output of crude oil; when the flowing capacity inadequate, the upper sealing segment of the bipolar optical mark seale, r is closed while its lower sealing segment is opened, and the pumping unit is stated to produce oil with rod, thereby integrating injection and production of the pumping unit.


                                       Model

Parameters

KR24.7-370

Nominal diameter mm

31/8

Working pressure MPa

35

Adaptive temperature

-18370

Type of connection

Flange

Specification in of adaptive casing pipe

51/2 95/8

 

Hits: 1043  Entry Time: 2013/12/23 【Print this page】 【Close
Copyright Dongying City Jinyi page to Petroleum Machinery Co., Ltd.
Address: Dongying City, Shandong Shengli Industrial Park Tel: +86-0546-8179188