Back Home | Homepage | Favorites
产品销售在线留言
·Current position: Home > Double-channel Thermal Recovery Wellhead Equipment
Product introduction Recommended products Contact us

Model KRS50/65-21 double-channel (vapor injection & oil production) thermal recovery wellhead equipment is suitable for intermittence thermal recovery or the recovery of ultra-thick oil. The equipment, which integrates vapor injection channel and oil production channel, has a compact structure. It can release pressure in inner bore of tubing, thus reduces the possibility of accident.

Characteristics
1.Has wonderful high temperature and high pressure resistance ability.
2.Reliable seal makes the product free from environment pollution.
3.Compact structure and small volume make it be convenient to install.
4.Flexible in rotation and convenient in operation and maintenance.Long lifespan.

Technical Specifications 

            Parameters

KRS80/65-21

Nominal Diameter of Vapor Injection (in)

3-1/16

Nominal Diameter of Oil Recovery (in)

2-9/16

Working Pressure (Psi)

3000

Working Temperature (°F)

-20~698

Connection Type

Flange/Thread 

Size of Connecting Casing (in)

10-3/4

External Dimensions L×H (in)

107×63

Weight (lb)

3923

 

Hits: 1031  Entry Time: 2014/5/29 【Print this page】 【Close
Copyright Dongying City Jinyi page to Petroleum Machinery Co., Ltd.
Address: Dongying City, Shandong Shengli Industrial Park Tel: +86-0546-8179188